The Shallow Ensign:Standard sewage treatment plant is the preferred option for those who require a PSTP without a Polylok filter. It uses a three-chamber filtration system to deliver clear effluent. Wastewater is treated to remove 97 per cent of pollutants. Ideal for installation in areas where the ground is hard, this treatment plant is just 1.6m in height. It uses a tried and tested filtration system to ensure the resulting effluent is safe to be discharged.
We recommend this packaged sewage treatment plant if you are looking to replace a septic tank or cesspool before regulations change in January 2020. This three-chamber plant is highly efficient and cost-effective. It is suitable for a wide range of environments and is popular with our domestic customers. This product complies with BSEN12566-3/A1:2009, is easy to install and straightforward to maintain.